SR30 over Bessemer

SCOPE
- Lightweight concrete Deck Modules cast with integral steel beams, 4 Modules weighing approximately 30 tons and 2 outer Modules with barrier weights approximately 50 tons.
- Deck Modules and Approach Slabs were all carefully match-cast.
- 28 Precast bridge components, weighing a combined 575 tons, were pre-assembled in the yard to ensure proper fit in the field.
- 56 LF bridge was erected in 57 hours through the use of Accelerated Bridge Construction methods with minimal disruption to the urban community.