SCOPE
- 3 Skewed, match cast Deck Modules with integral steel beams.
- 14 Inverted-T Abutment units totaling 280 tons, post-tensioned together on site.
- Additional were precast wing walls, sleeper slabs, and abutment pedestals for a total of 91 pieces on the bridge and totaling just under 1M pounds of concrete.
- The entire bridge was dry-fit together in our yard prior to delivery