Charleroi Locks & Dam Emptying Basin

Custom Structural
Rebar Fabrication
Pre-Tie
owner
US Army Corps of Engineers, Pittsburgh District
customer
Brayman Construction
location
Charleroi, PA
product
Emptying Basin

SCOPE

  • Seven precast reinforced concrete segments form the outer shell of the 50’ x 110’ Emptying Basin.
    Each precast segment weighed up to 220 tons.
  • Segments were fabricated at a specially PCI Certified site along the river near the dam.
  • Use of massive stay-in-place steel formwork formed basin walls.